1×150 MW Power Plant at Sirupulalpettai Village Gummidipoondi Taluk by Accord Energy Corporation Pvt. Ltd

2×150 MW Coal Based Thermal Power Plant of at village  Sirupulalpettai, in Gummidipoondi Taluk, in Thiruvallur District , in Tamil Nadu

The proposal is for setting up of 2×150 MW Coal Based Thermal Power Plant using PF Based Boiler at village  Sirupulalpettai, in Gummidipoondi Taluk, in Thiruvallur District , in Tamil Nadu. The proposed THERMAL POWER PLANT shall be located at a distance of 7.5 km from the boundary of Andhra Pradesh and hence is an inter-state case. Imported and domestic coal in the ratio 50:50 will be used as fuel. Water requirement will be 180 KLD, out of which 70% will be met from harvested rain water and remaining shall be met from recycled and ground water. Air cooled condenser will be used. The Committee was of the view that in case of the Power Plant proposes to use PF boilers in such a case either the Power Plant has to restrict the sulphur content in coal to acceptable levels or come out with a solution to arrest SO2 emission in the EIA Studies if required Provision for FGD shall be put in place in case of future requirement

The project was considered for issuing ToR on Feb 12, 2010 and the ToR was issued on Mar 12, 2010

Contact :
Accord Energy Corporation Pvt. Ltd
# 29, Tilak Street,T. Nagar,Chennai 600017 Tamil Nadu

Switch to our mobile site