350 MW Combined Cycle Power Plant phase-III Expansion at Vijjeswaram by APGPC Ltd

2×350 MW (Phase-III) Gas Based Combined Cycle Power Plant at village  Vijjeswaram, in Rajamundryi District , in Andhra Pradesh

The proposal is for expansion of the existing Gas Based Power Plants (Stage-I: 2×33 MW GTG + 2 HRSG + 1×34 MW STG; ; and Stage-II: 1×112 MW GTG + 1 HRSG + 1×60 MW STG) by addition of 2×350 MW. Environmental clearance for Stage-II was accorded on 25.07.1996. The proposed expansion (Stage-II) will be located near the existing units over an area of 59 Acres of land which are yet to be acquired. Gas require will be 4.0 MMSCMD, which will be obtained from KG-D6 offshore gas fields and GAIL, Rajamundry, through pipeline covering a distance of about 72.0 kms. Water requirement will be 1332 cum/hr (316 cusecs), which will be met existing source. No additional water is required.

The project was considered for issuing ToR on Sep 10, 2009 and the ToR was issued on Nov 04, 2009

Contact :
APGPC Ltd
201, 2nd Floor, My Home Secretariat Road, Sarovar Plaza Hyderabad 500063 Andhra Pradesh

Switch to our mobile site