395MW Gas based extension CCPP Unit III at Dhuvaran by GSECL

The proposal is for expansion of existing 106.617 MW and 112.45 MW Gas Based THERMAL POWER PLANT by addition of 395 MW Gas Based THERMAL POWER PLANTP at village Dhuvaran, in Kahambat Taluk, in Anand District , in Gujarat. Besides the above units other units which will be de-commissioned are 4×63.5 MW Oil Fired Plant; 2×27 MW Open Cycle Gas Turbine and 2×140 MW Open Cycle Gas Turbine. Land requirement will be 30 acres, which is available within the existing premises. Gas requirement will be 1.8 MMSCMD, which will be obtained from GAIL/GSPCL. Water requirement will be 13.8 MLD, which will be obtained from Mahi Canal and Reservoir at Kanbha village  from existing pipeline.

The project was considered for issuing Environment Clearance  on Jan 12, 2011 and the Environment Clearance  was issued on Jan 13, 2011