The project involves setting up of 21 MW Bagasse Based Co-Generation Project at village Pangari, in Tehsil Parali, in District Beed in Maharashtra. Land requirement for the plant will be 5.0 Acres, which is within the Sugar factory. Bagasse and Bio-Gas only will be used as fuel. No coal will be used. Bagasse requirements will [...]
Archive for the ‘Maharashtra’ Category
1X300 MW Phase-2 TPP in Warora by Emco Energy Ltd
The project involves expansion by addition of 1×300 MW (Phase-II) Coal Based THERMAL POWER PLANT in MIDC ? Warora Industrial Area, in Chandrapur District , in Maharashtra. Environmental clearance for Phase-I was accorded on 19.05.2008. The site is located at about 40 km from Chandrapur town. Land requirement will be 114.0 ha for both Phases [...]
750 + 10 % MW Gas Based PP at Village -Kandalgaon (Budruk), by AES (India) Pvt. Ltd
750 MW Gas Based Combined Cycle Power Plant at village Kandalgaon, in Mangaon Taluk, in Raigad District , in Maharastra The proposal is for setting up of 750 MW Gas Based Combined Cycle Power Plant at village Kandalgaon, in Mangaon Taluk, in Raigad District , in Maharastra. Land requirement will be 100 acres, which is [...]
5×660 MW Coal based TPP at Dondaicha, Tehsil Sindkheda by Maharashtra State Power Generation Co. Limited
5×660 MW Dondaicha Coal Based Thermal Power Plant near village s Vikharan, Methi & Varjhadi, in Sindhkheda Taluk, in Dhule District , in Maharashtra The proposal is for setting up of 5×660 MW Coal Based THERMAL POWER PLANT near village s Vikharan, Methi & Varjhadi, in Sindhkheda Taluk, in Dhule District , in Maharashtra. The [...]
2×800 MW Koradi TPS expansion by MAHAGENCO
The company is planning to take up replacement of existing 4 units of 120 MW each by 1×660 MW unit and addition of 2×660 MW units. Additional fresh water will be required for this proposed expansion project will be met from the sewage collected by Nagpur Municipal Corporation after treatment. MoU with Nagpur Municipal Corporation [...]
1320 MW Theremal Power Project near Mandva vill by Lanco Mahanadi Power private Ltd
The project involves setting up of 2×660 MW Coal Based THERMAL POWER PLANT at village Mandwa, in Wardha Taluk & District , in Maharastra. Land requirement will be 1195 acres, out of which 484.13 acres has been purchased and rest is under progress for acquisition. Coal requirement will be 7.5 MTPA. Coal will be obtained [...]
2×300 MW Coal based Thermal Power Project in MIDC industrial area at village Tadali by Dhariwal Infrastructure(P) Ltd.
The project involves setting up a 2×300 MW Coal Based Thermal Power Plant in MIDC Industrial Area, at village Tadali, in District Chandrapur, in Maharashtra. Land requirement will be 480 acres. Coal requirement will be 11040 TPD and will be sourced from SECL mines. Coal linkage has been obtained from Ministry of Coal. Water requirement [...]
2X660 MW TPP Near Mauda by NTPC Limited
The project involves setting up of 2×660 MW (Stage-II) Super-Critical Coal Based Thermal Power Plant at village s Mouda, Kumbhari, Lapka, Koradi, and Rahli, in Taluk Mouda, in Nagpur District , in Maharashtra. 2×500 MW (Stage-I) is under construction. Land requirement shall be restricted to 1800 acres for both the Stages-I&II. Out of total land [...]
2×660 MW Super TPP by NTPC Ltd.
The project involves setting up of 2×660 MW Super-Critical Technology Coal Based Solapur Thermal Power Plant at Village s Fatatewadi & Ahirwadi, in South Solapur Taluk, in Solapur District , in Maharashtra. No diversion of forest land is involved. R&R will be involved. It is noted that the above project is under the bulk tendering [...]
Add. 7.5 MW (3X2.5MW) Captive PP at Verma Industrrial Estate, Verma Goa by Cipla
2×660 MW (Super Critical) Coal Based Thermal Power Plant in MIDC ? Nandgaon Peth Industrial Area, in Amravati District , in Maharashtra The proposal is for expansion of the existing Captive Power Plant of 4.10 MW (HFO Based) by addition of 7.5 MW. The plant is located in notified industrial area developed by Goa State [...]